The challenge
The data centre’s EPMS had to connect dozens of critical power assets across the electrical room, data hall and external generator areas. Those assets included main switchboards, UPS systems, power distribution cabinets and generators. Every cable had to follow strict routing, containment, labelling and testing requirements under Australian Standards and the client’s own control specification, inside a live, highly controlled hyperscale construction environment.