Case study

Commercial Solar for Schools in Western Sydney

Raiden Technologies designed and installed a 13.2kW three-phase rooftop solar system for the new 40-place public preschool at Hebersham Public School, giving the building clean, low-cost daytime power from its first day.

IMG_0570

A 13.2kW three-phase solar system suits a 40-place preschool because its power use peaks during daylight hours. Raiden installed one at Hebersham Public School using 30 Trina panels and a Fronius 15kW inverter.

Project summary

Raiden supplied and installed a 13.2kW rooftop solar system on the new preschool at Hebersham Public School, built to the NDY engineering specification. Thirty Trina all-black panels feed a Fronius 15kW three-phase inverter, with a Fronius smart meter tracking production and use in real time.

Client
Hebersham Public School
Location
Western Sydney, NSW 2270
Project date
2026-06-28

The challenge

The new preschool needed a solar system to cut its running costs and meet the Department’s sustainability goals, delivered as part of a busy new build. The system had to meet the engineering specification, connect safely to a three-phase supply, and look neat on a new building used by young children and families.

The solution

Raiden installed 30 Trina all-black 440W panels on mounting brackets, with all cabling and containment. They connect to a Fronius 15kW three-phase inverter, and a Fronius 63A three-phase smart meter gives staff clear visibility of solar production and building energy use.

Systems Installed

Security and electrical systems delivered on this project.

  • Rooftop Solar Array

    30 × 440W Trina all-black panels, 13.2kW in total.

  • Three-Phase Inverter

    Fronius 15kW three-phase inverter, matched to the preschool’s supply

  • Smart Energy Meter

    Fronius 63A three-phase smart meter for real-time monitoring of production and use.

  • Mounting & Containment

    Mounting brackets, cabling and containment installed to specification.

The outcome

The preschool now generates much of its own daytime electricity, which cuts grid power use and running costs during the hours it is open. The smart meter gives the school clear data on production and use, which supports its sustainability reporting.

Outcome metrics

rooftop solar capacity
13.2kW
clean energy a year
~18,000 kWh
CO₂ avoided per year
~12 tonnes
30
panels installed

Project gallery

IMG_0655
IMG_0575
IMG_0577
IMG_0591
IMG_0594
IMG_0598
IMG_0657
IMG_0664
IMG_0669

Testimonial

““Raiden delivered the solar as part of our new preschool build without any disruption. The system looks great on the roof, and being able to see exactly how much power we’re producing makes it easy to share our sustainability story with families. It’s a great outcome for the school and the community.””

Site Manager, Hebersham Public School

Related capability

Explore connected security, electrical and industry capability across Sydney and NSW.

Frequently asked questions

What size solar system does a preschool or school building need?

It depends on energy use and roof space. For Hebersham’s 40-place preschool, the specification called for a 13.2kW system, which Raiden delivered with 30 Trina 440W panels.

Is solar worth it for schools in Sydney?

Yes. Schools use most of their power during the day, exactly when solar is producing, so they use most of what they generate on site. That means lower bills and a quicker return than most residential systems.

Why use a three-phase inverter for a commercial building?

Most commercial and school buildings run on three-phase power. A three-phase inverter like the Fronius 15kW spreads the solar output across all three phases, so the system can run at full capacity and stay within network rules.

How much electricity will a 13.2kW system produce in Western Sydney?

Roughly 45–55kWh a day on average, or about 17,000–19,000kWh a year, depending on roof orientation, tilt and shading. Raiden models the expected output for each site before installation.

How do schools monitor solar performance?

With a smart meter and the inverter’s online portal. The Fronius smart meter at Hebersham shows real-time production and building use, so staff can track savings and report on sustainability.